2009 - 2015 Contract to Jacobs Engineering Electrical Engineering and Design (Motiva, BP, Marathon, Shell)
2007 - 2009 ENGlobal Engineering Senior Project Manager (Valero Energy Projects) Electrical Department
2005 - 2007 Valero Energy Corporation
2002 - 2005 The Premcor Refining Group, Inc
2000 - 2002 Clark Refining and Marketing Port Arthur Refinery (Name Changes for Same Plant) Staff Electrical Engineer (Project Manager/Engineer)
1999 - 2000 Newtron, Inc. Electrical Project Manager/Engineer for Clark Refining and Marketing at Port Arthur Refinery Electrical/Instrumentation Contract Position
1989 - 1999 Petrocon Engineering, Inc. Project Engineer/Manager Small Electrical Projects Electrical/Instrumentation
1985 - 1989 PetroFac, Inc. Electrical Engineering Specialist
1984 - 1985 S. D. Tucker and Associates Electrical Designer
1982 - 1984 P.P.C. Industries, a Division of Advance Ross Electronics 10/22/2018 Electrical Designer PROJECT TYPES 230kV Plant System and Cogeneration 230kV 4 Mile Dual Circuit Transmission line BP, Shell, Marathon Mid Cap Projects Motiva Crude Expansion Project 13.8kV/480V Substation 13.8kV Switch-Over Station 401 Air Separation Unit Cyclohexane Offsite 13.8kV/4160/480V Substation 13.8kV Plant Substation Utility Tie Cooling Tower Motor Starter Retrofit DCS Installation Benzene Medium Voltage Motor Starter Retrofit Plastics Flake Cooling and Segregation Electrical Distribution System Drawing Update Sour Water Stripper Control Room Standby Power System OSHA Process Safety Management (Electrical HAZOP) Plastics Finishing Project Cogeneration Electrical/Instrumentation 13.8KV Substations and Cogeneration Mogas Blending Instrumentation Substation and Switchgear Testing 880 Tertiary Stripper Modifications Glycol Regeneration Unit DCS Conversion ESD and Alarm System Electrostatic Crude Oil Treater 2,500 BPD Catalytic Reformer Gas Plant Power Distribution Atmospheric Crude Unit 10,000 BPD Louisiana Gas Plant CO 2 Dehydration Unit Catalytic Polymerization Unit 20 MMSCFD LPG Plant Power Distribution Equipment 6 MMSCFD Amine Sweetening Unit Ketone 2 Power Distribution Center Two (2) 150,000 BPD Separation Facilities Production Facilities Lean Oil Absorption Plant Electrostatic Precipitators Power Distribution Revamp
Provided electrical project management, engineering, and design for multiple projects. Responsible for electrical projects from feasibility to startup. Managed multiple projects and personnel simultaneously for projects ranging from $50k to $50 million. Total authorized for expenditure (AFE) budget exceeded $70 million. Also provided continual support to the electrical maintenance department and support for major capital projects. Responsible for upgrading the Port Arthur Refinery power distribution system to a 230kV system consisting of new dual 230kV transmission lines, new 230/69kV substation, and new 69/13.8kV south plant substation. Project also included installation of an 80MW gas turbine with HRSG and 20 MW steam topping turbine for yard steam. Made numerous reliability improvements to the refinery electrical system. Clark Refining & Marketing, Port Arthur, Texas (Contract) Senior Electrical Engineer Provided electrical project management, engineering, and design for small projects. Designed HOUP project SCADA system interface to existing Power Station 5 SCADA system. Chevron Chemical Company, Port Arthur, Texas Project Manager Provided project management, engineering, and design for a 13.8KV double bus and associated distribution switch over station. Assisted the client in estimating and budget approval for the project. Engineering consisted of short circuit studies, load flow studies, and a coordination study. Aramco Services Company, Houston, Texas Riyadh Refinery No. 2, Riyadh, Saudi Arabia Electrical Project Manager Provided electrical system studies for a 13.8kV to 480V selective secondary substation to supply power for buildings, DCS equipment, ESD equipment, computers, etc. Designed the power distribution system and UPS system to supply a total of (5) buildings with DCS systems. Purchased electrical equipment, and provided witness testing of equipment for specification compliance. Mobil Chemical Company, Beaumont, Texas Electrical Project Manager Provided engineering and design for 4160 V/480V power distribution system to supply pumps and process equipment. Provided electrical studies and calculations for sizing equipment. Electrical equipment consisted of substation transformers, and 4160 V & 480V MCC's installed in a prefabricated building. Pole line distribution for 13.8kV circuits was provided from an existing substation to new 13.8kV switchgear at the Cyclohexane Unit. 10/22/2018 Air Liquide, Houston, Texas Project Engineer Provided various electrical studies for a plant expansion and electrical system upgrade. Retrofitted relaying for 1750 HP to 13,000 HP motors, and installed new 4160 V and 480V switchgear with MCC's and associated distribution. Chevron Chemical Company, Port Arthur, Texas Project Manager Provided project management, engineering and design for a 69KV/13.8KV utility tie to the plant facility. Assisted in estimating and budget approval for the project. Engineering consisted of multiple short circuit studies, load flow studies, motor starting analysis with load flow, and a coordination study. Provided engineering and design for a double bus double breaker substation and associated distribution. Chevron Chemical Company, Port Arthur, Texas Project Engineer Replaced Performed a short circuit study to determine duty ratings of equipment, and load study. oil immersed 2400 V motor starter with vacuum starters for the Benzene Unit. Chevron Chemical Company, Port Arthur, Texas Project Engineer Replaced oil immersed 480V motor starter with air break starters for cooling tower and interconnected starter control logic with GE Genius PLC. Chevron Chemical Company, Port Arthur, Texas Project Engineer Developed and updated one line diagrams, area classifications, schematics, and cause and effect tables for Benzene and Cumene Units. Chevron Chemical Company, Port Arthur, Texas Project Engineer Provided engineering and design for 2400 V transfer pump motor controllers for Raw Pyrolisis Gasoline (RPG) project. Lyondell-Citgo Refinery, Houston, Texas Electrical Engineering Specialist Provided Honeywell TDC 3000 equipment installation design. Amoco Chemical Company, Cedar Bayou, Texas Engineering Specialist Provided 480v. power distribution for motors on Plastics Flake Cooking and Segregation project. Performed a load study and short circuit study. Checked System protective coordination, provided short circuit study, and a complete load study. 10/22/2018 Mobil Oil Corporation, Beaumont, Texas Engineering Specialist Updated Electrical Distribution System one line diagrams. ARCO Pipe Line, Houston, Texas Engineering Specialist Provided the design for electrical generation and power distribution to supply power and standby power to the SCADA control room located in a high rise building. Exxon Chemical Company, Mont Belview, Texas Project Engineer Provided engineering and design for variable frequency drive installations on plastics extruder project. The largest VFD controlled an 1100 HP, 660V, 3 phase Melt Pump. Mobil Oil Corporation, Beaumont, Texas Project Engineer Provided preliminary engineering and design for the Ketone 2 Power Distribution Center to supply existing and new 2.4KV and 480V loads. Chevron Refinery, Port Arthur, Texas Electrical Engineering Specialist Sour Water Stripper Provided power distribution engineering and design for the plant consisting of multiple 13.8KV/480V transformers. Cogeneration Electrical/Instrumentation Responsible for utility/plant cogeneration tie metering and metering inputs into the PLC/SCADA system. OSHA Process Safety Management Responsible for researching and updating the Chevron electrical system to comply with proposed OSHA mandate 29CFR1910.119. Mogas Blending Instrumentation Responsible for the implementation of single loop electronic controllers for process control in units CRU 1344 and HFAU 443. Cogeneration Power Distribution
Developed design for cogeneration power distribution and cutover from existing Power Station No. 5 to new power station. The project consisted of interconnecting the plant power system with the utility via dual 25 MVA, 69/13.8KV transformers and installing a SCADA system for remote telemetry and control at Power Plant #2. The communication link consisted of dual fiber optic routes approximately 2 miles each in length. The control system included local and remote metering at both the 13.8KV (plant) and 69KV (utility) voltage levels, synchronizing at 13.8KV locally and remote, protective relaying, system CRT graphics, and interfaces between analog and digital equipment. 10/22/2018 Goodyear Chemical, Beaumont, Texas Electrical Engineering Specialist Designed 480V power distribution and control for the 880 Tertiary Stripper Modifications. Pennwalt Corporation, Beaumont, Texas Electrical Engineering Specialist Supervised substation and switchgear testing for the 15 MVA, 13.8KV plant power supply. Recommended and supervised corrections made to equipment by contractor. Mobil Oil Corporation, Beaumont, Texas Electrical Engineering Specialist Responsible for power distribution including UPS design to nine Satellite Instrument Buildings for the DCS Conversion project. Also provided dual redundant fiber optic design package for communication data hiway between Central Control Building and Satellite Instrument Building. ARCO Electrical Engineering Specialist Glycol Regeneration Unit - High Island Block 116 "A" Designed burner management system and shutdown system. Electrostatic Crude Oil Treater - High Island Block 116 "A" Provided design for control panel and on skid conduit routing. Oxy Pakistan Electrical Engineering Specialist ESD and Alarm System - Pakistan Designed control and ESD System for crude separation and desalting equipment. 20MMSCFD LPG Plant - Pakistan Provided design work for complete plant power distribution and electrical control system. Yemen Hunt Electrical Engineering Specialist Atmospheric Crude Unit 10,000 BPD - North Yemen Complete plant power distribution and electrical control system engineering and design. 2,500 BPD Catalytic Reformer - North Yemen Engineered and designed complete plant power distribution and electrical control system. Power Distribution - North Yemen Purchased and installed motor control centers for plant distribution. Two (2) 150,000 BPD Separation Facility - North Yemen Provided electrical control system for two (2) 150,000 BPD separation trains a complete consisting of: two (2) test separators, six (6) high pressure separators, six (6) intermediate separators, six (6) low pressure separators, six (6) desalters, and two (2) knock-out drums. Lean Oil Absorption Plant - North Yemen Engineered and designed a complete distribution system including a 10 MVA substation consisting of (2) 3750 KVA transformers, (2) 1500 KVA transformers; switchgear for 10/22/2018 transformers, and motor control centers for (4) 1500 HP motors and low voltage motors. System operated at 50Hz. Chevron Electrical Engineering Specialist CO 2 Dehydration Unit - Rangley, Colorado Designed plant control system including control panels, A-B PLC 2/15 pump and compressor controls, conduit routing and lighting system. United Gas Pipeline Electrical Engineering Specialist Louisiana Gas Plant - Louisiana Designed complete plant power distribution and electrical control system. Texaco Angola Electrical Engineering Specialist 6MMSCFD Amine Sweetening Unit - Offshore Angola, Africa Handled design work for a complete pneumatic control system including a pneumatic control panel for the unit. Power Distribution Equipment - Offshore Angola, Africa Provided platforms. transformers and metering equipment for Lombo East, Suele West, and Tubaro Hill Petroleum Electrical Engineering Specialist Catalytic Polymerization Unit - Krotz Springs, Louisiana Designed a complete power distribution system for the unit consisting of transformers and distribution equipment. Power was reduced from 13.8KV to 480V for plant electrical loads. Amoco Electrical Engineering Specialist Power Distribution Revamp - Edgewood, Texas Designed a new power distribution system to replace the existing failing system. Al Furat Petroleum Company Electrical Engineering Specialist El Ward Production Facilities - Del Zoir, Syria Engineering and design for a complete generating station and distribution system consisting of (3) 3.3MW Gas Turbines, (6) transformers, (6) Gas/Diesel Generators and pole line distribution. P.P.C. Industries - Division of Advance Ross Electronics Electrical Designer Electrostatic Precipitators - U.S.A. Designed throughout the U.S. Traveled the U.S hiring electrical contractors for electrical construction and installation of electrical equipment. Provided dead air testing, systems test, and start up of the units. power distribution and control systems for electrostatic precipitator installations 10/22/2018 Loring Air Force Base (SAC) - ESP Unit on Coal Fired Boilers Defense Construction & Supply Company (DCSC) - ESP Unit on Coal Fired Boilers Chillicothe Correctional Institute - ESP Unit on Coal Fired Boilers Tuscaloosa Municipal Waste - ESP Unit on Steam Cogeneration Trash Incinerator Southern Illinois University - ESP Unit on Coal Fired Boilers (Dead air test only) 10/22/2018 JEFFERY S.
Education / Training / Certificates(4)
Frequently Asked Questions
- What does Jeffery do?
- Jeffery is a Senior Project Manager on Automate America, the global professional marketplace for skilled talent across industrial, commercial, and residential work.
- Where is Jeffery located?
- Jeffery is based in Avinger, Texas.
- What does Jeffery specialize in?
- Jeffery works with GE, Honeywell, Autodesk, SAP, Windows as a Senior Project Manager on Automate America, the global professional marketplace for skilled talent across industrial, commercial, and residential work.
- Is Jeffery available for work?
- Availability unknown. Jeffery has not marked it recently.
- How do I connect with or hire Jeffery?
- Create a free profile on Automate America and send a connection or contract request from this profile. Jeffery can then respond and coordinate the work directly through the platform.