Shujah — Robotic Engineer / Project Engineer
Shujah
Industries Served
Languages
Documents on File
Programming Skills 4
Achievements
2
Profile

Tenure
About Me
Results-driven Production, Maintenance and Controls professional with extensive experience in electromechanical systems, industrial automation, PLC programming, and modifications in high-volume automotive manufacturing industry. Adept at leading teams to improve equipment reliability, uptime, and safety while driving continuous improvement and long-term maintenance strategy. Hands-on expertise with Siemens PLCs, KUKA and ABB robotic, servo drives, and vision systems, collaborating with Engineering, IT, and Production teams to standardize controls and support CMMS and SAP workflows.
Education and Skills
INS Santa Eulalia, Terrassa, SpainElectromechanical and Electrical Installations, 2015-2019
Master D, Barcelona, SpainSiemens Automation and Robotics 2020-2021
Languages - English, Spanish, Hindi, Urdu, Punjabi and adaptable to new environments and multicultural teams.
Controls & Automation
Siemens STEP 7 and TIA Portal, ABB and KUKA robotics, TRUMPF laser systems, Lenze servo drives, SICK safety scanners and vision systems.
Maintenance & Reliability
Preventive and predictive maintenance, TPM, CMMS, root-cause analysis, equipment reliability and uptime optimization.
Skilled Trades 3
Performed preventive maintenance and troubleshooting on automated production lines to reduce unplanned downtime. Maintained preventive maintenance record and documentation within CMMS while recommending improvements to PM schedules and procedures. Maintained machine vision systems, pneumatic, and electronic process-control systems while resolving PLC, drive, vision system faults. Supported ABB robot programming modifications and maintained system documentation and software backups. Led the maintenance team by implementing preventive and predictive maintenance, 5S and TPM initiatives. Developed long-term maintenance strategies and obsolescence plans while improving KPIs by reducing reactive maintenance.
Build of electromechanical and pneumatic systems. I can assemble and install complete machine cells, including laser-welding systems, conveyor systems, automated storage and retrieval systems (AS/RS), robotic wire-welding systems, and laser-cutting machines. With the appropriate documentation and blueprints, I can install / commissioned and assemble a wide range of electromechanical machines and automated cells.
My background includes tool and die work
Professional Competencies 2
Kuka robotic support.
Applications 12
Tools, Machines & Equipment 5
My Business
Work Preferences
Work Experience6
Charleston, SC Lead mechanical, electrical, and controls troubleshooting for body-in-white (BIW) and Paint shop equipment including Siemens PLCs, ABB and KUKA robots, Lenze drives, SICK scanners. Troubleshoot welding systems, glue pumps and dosing systems, and stud welding systems to minimize downtime and improve equipment reliability. Collaborate with Engineering teams and contractors, incorporating root-cause analysis findings into preventive maintenance plans and standardized work procedures. Reduced reactive maintenance by 40% through preventive maintenance improvements.

Fort Myers, FL Performed preventive maintenance and troubleshooting on automated production lines to reduce unplanned downtime. Maintained preventive maintenance record and documentation within CMMS while recommending improvements to PM schedules and procedures.
Madrid, Spain Installed, commissioned, and serviced Trumpf laser welding and cutting systems across Spain and Portugal. Troubleshot PLCs, servo drives, and robotic automation systems while training customer maintenance teams on preventive maintenance and safe equipment operation.
Barcelona, Spain Maintained machine vision systems, pneumatic, and electronic process-control systems while resolving PLC, drive, vision system faults. Supported ABB robot programming modifications and maintained system documentation and software backups.

Barcelona, Spain Led the maintenance team by implementing preventive and predictive maintenance, 5S and TPM initiatives. Developed long-term maintenance strategies and obsolescence plans while improving KPIs by reducing reactive maintenance.
Barcelona, Spain Managed and led production operations while collaborating with engineering and maintenance teams to achieve productivity, scrap, and downtime KPIs. Led continuous improvement and cycle-time reduction projects while ensuring compliance with TPM and 5S standards. Led team of 4 techs.








