Gary — Maintenance Technician
Gary
Industries Served
Work History on Automate America
Documents on File
Achievements
3
Tenure

Profile

Skills
Programming Skills 9
Skilled Trades 14
Professional Competencies 13
Applications 22
Tools, Machines & Equipment 3
Eligibility
Work Experience28
1980 - 19813 PICO / Progressive Tool & Industries Machine Tool Electrician - Automotive Spot Welding Systems controlled by Relays and PLC Controller Systems - Panel Building with PLC, Allen Bradley, Modicon. Including Westinghouse Numalogic - New Equipment Build Up, Run-Off and follow-up Installation Support

09/12 to Present Kaiser Aluminum & Chemical, Sherman TX Maintenance Technician Remelting, Casting Operations (Up to 60,000 lbs) Extrusion up 3600 ton PLC, A/C Drives, Furnace Control Systems

2003 - 2004 Fry's Marketplace Asst. Grocery Manager

2000 - 2002 Kinetics Chempure Systems Customer Support Manager - Manage on-site Service Contracts for previously installed equipment at N.A. Customer Facilities - Generate Proposals and author contracts for site specific service support requirements - Negotiate with customers for new accounts and renewal of existing contracts

1989 - 2000 Yaskawa Motoman Product Development Manager - Develop and Manage Niche' Business Segments, hand off to operations upon reaching critical mass - Robotic Systems using Lasers (CO2 & YAG), Plasma Cutting & MIG Welding Technologies - Prior Marketing manager responsibilities 1996 to 1998 - Responsible for Setting up Regional Technical Center in Detroit, Michigan 1995 to 1996 - Prior Contracts & Administration Responsibilities 1989 to 1995

1983 - 1989 GMFanuc Robotics Sales Account Manager - Managed two (2) major accounts, Chrysler Motors and Caterpillar - Robotic Systems integrated into Class 1 Div 1 Painting Applications - Project manager of $24M System at GM Doraville, GA. Plant - Project Manager of $8M system at Caterpillar Decatur, IL. Plant - Managed T&D Support for Auto Painting Systems first two years with GMF Resume' of Gary H.
1981 - 1983 General Dynamics Land Systems Division Plant Engineering Troubleshooter - Support of 54 CNC Machining Centers located within the Army Arsenal Tank Plant in Warren, MI - Facility produced components & F.A. for M1 Abrams & M60A2 Battle Tanks. - Received extensive training to troubleshoot equipment in plant - Responsible for writing Technical Specifications for future Machine Tool(s) Purchased for M1A

1978 - 1980 Cross & Trecker Corp, Controls Service Tech - Automated Machining Centers used in Automotive & Heavy Off Road Industries - New Equipment Build Up, Run-Off and follow-up Installation Support - PLC & CNC Controlled Systems
1976 - 1978 PICO / Progressive Tool & Industries Machine Tool Electrician - Automotive Spot Welding Systems controlled by Relays and PLC Controller Systems - New Equipment Build Up, Run-Off and follow-up Installation Support

1974 - 1976 Detroit Plastic Molding Maintenance Electrician - High Tonnage Extrusion Presses and grinding machines - Installed Class I Division I Naphtha Recovery Room Project

1973 - 1974 McAffee-Guthrie Apprentice Electrician - Residential (Condos & Single Family Houses) - Commercial Buildings (EMT Conduit) - Industrial, Coated Rigid (Casting Plant)

03/11 to 09/12 Encore Wire Corporation Mckinney, TX Maintenance Electrician Troubleshooting of PLC Motor Drives AC & DC Tach & Encoder Light Curtains, E-Stop Systems, Conveyor Motors & Controllers

08/09 to 01/10 Luminant Martin Lake SES Tatum Texas (Contract Position) Facilities Infrastructure Installation of NERC-CIP compliance access locations Project manager of Facilities Installation - Point of Access Devices (Card Readers, Cameras, Motion Sensors, etc.) - Multimode Fiber Optics, Cat 5e and low voltage power distribution. - Commissioning Support to test system for NERC-CIP compliance

07/08 to 04/09 Buckeye Electric Co. Cincinnati, Ohio (Contract Position CRA)

Termination & Start-up Electrician (Sky Harbor Terminal 4) Recently working at CVG Airport Terminal 2 - Installation of new baggage conveyor & X-Ray Systems - Installation of Remote I/O, HMI Panels and motor controllers - Terminate Main PLC Cabinets - Terminate Cat 6 and BNC RG Cables 02/08 to 04/08 CPT - Wilson Electric Services Corp Lead Installation Service Tech (Haraquahala Power Plant Tonopah AZ) - Installation of new Low Voltage (480/277/120) Circuits - Installation of Remote I/O Cabinets for process control of RO Water Systems - Installation of new control systems associated with gas turbine operation Corbins Electric JW Electrician Level 2 / Intel Ocotillo Fab 32 Litho Tool Installation
1/08 - 2/08 - Installation of new Low Voltage (480/277/120) Circuits Resume' of Gary H.

11/07 - 1/08 Russelectric, Inc. Hingham, MA. Regional Field Service Engr CPT - Wilson Electric Services Corp

6/06 - 11/07 Detail Engineer and Installation Manager - AC Power - Projects Coordinator for Electrical Service Dept Projects Range from $5K to $500K+ Contracts - Responsible for developing new accounts & managing current project(s) cradle to grave - Generate Proposals (Site Inspection, estimating and authoring of proposals) - Hit Rate in winning new project work is 60%. Winning Bids are very close to competitors. - Successful Completion of Telecom Switch Center, School Renovations & Warehouse Dis. Centers - All projects completed have exceeded companies benchmarks in profitability - Promoted from Service Coordinator to Manager Position - Promoted from Service Tech Position (Entry Position upon hiring)
8/04 - 6/06 Delta Diversified Enterprises Controls Foreman - Successfully completed two major Data Centers in the Valley - Both Data Centers had over 16mW Generator Capacity using Russ Electric & Liebert Gear - Promoted from JW position to Foreman - JW Electrical Experience at Major Semi-Conductor Facility in Chandler, AZ - Solar Field Installation Experience Prescott AZ



















