Gerardo — Controls Engineer
Gerardo
Pay Rates
Industries Served
Languages
Service Radius & Travel
Work Preferences
Eligibility
Work History on Automate America
Documents on File
Programming Skills 7
Achievements
3
Tenure

Profile

Skills
About Me
Commissioning and start-up of cells with Spot and Mig welding robots, as well as cells with material handling robots.
Programming Skills with Allen Bradley, Siemens and Beckhoff PLC.
HMI skills with FT View ME, Ignition, WinCC Flexible 2008 and WinCC Comfort
Knowledge of Industrial Networks like Ethernet/IP, DeviceNet, ControlNet, DH+/RIO, Profibus, Profinet, IO-Link.
Robotic Skills with Fanuc and ABB Material Handling applications.
Knowledge of Hydraulics, Pneumatics and electrical systems
Skills with Hot Stamping and Hydroforming Press
Interpretation of electrical, hydraulic and pneumatic diagrams.
Skills withs other devices like Telesis, Gravotech (Technifor) Markers, Vision Systems, RFID readers.
Skilled Trades 1
Programming PLC (Allen-Bradley, Siemens, Beckhoff), Programming HMI (Panel View 7, Ignition, WinCC Flexible). Programming Robot Fanuc Intermediate
Software Competencies 6






Professional Competencies 5
HMI skills with FT View ME, Ignition, WinCC Flexible 2008 and WinCC Comfort
Knowledge of Industrial Networks like Ethernet/IP, DeviceNet, ControlNet, DH+/RIO, Profibus, Profinet, IO-Link. Manage of Stratix and ArmorStratix Industrial Ethernet Switches.
Commissioning and start-up of cells with Spot and Mig welding robots, as well as cells with material handling robots. Programming Skills with Allen Bradley, Siemens and Beckhoff PLC.
Robotic Skills with Fanuc and ABB Material Handling applications
Applications 2
Tools, Machines & Equipment 3
Work Experience3
Offline program develop for Studio 5000 HMI Screens Development with Factory Talk View ME & Ignition Design and implementation of Ethernet/IP networks for I/O control. Commissioning of spot welding cells. Debug cells running dry cycle. Markers configuration Telesis, Gravotech (Technifor) Develop of Safety programs in Guardlogix PLC Reduction of cycle time in spot weld cells.
Coordination and support in the installation of 2 hot stamping lines and 1 hydroform press Siemens S7-300 PLC integration Upgrade of panel view 1400e and 1000 to Panel view plus 6 Upgrade of SLC 500 and PLC 5 to Control Logix 5000 Upgade of RIO network to EthernetIP S430iW robot upgrade to 2000iB/210F Throubleshooting in hydroforming and hot stamping press. Throubleshooting in robots (Fanuc and ABB) Corrective and Preventive Maintenance in Fanuc/ABB Robots Improvements in cycle times in equipment and robots.
Changes of operation sequence in stations Troubleshooting in production lines, DeviceNet and Ethernet networks Improves to cycle time in production lines Development and debugging of programs in ControlLogix, PLC5, Micrologix, SLC 500 Work with Ethernet/IP, DeviceNet and DH+ networks Changes in HMI's Development and implementation of the Andon system (OEE, parts produced and dead time)
Education / Training / Certificates1

Facilities Worked At2
Related professionals
- JulioControls Engineer · Saltillo, Coahuila
- EstephanyControls Engineer · Saltillo, Coahuila
- JuanControls Engineer · saltillo, coahuila
- ErickControls Engineer · Ramos Arizpe, Coahuila
- DavidControls Engineer · Saltillo, Coahuila
- PedroControls Engineer · Ramos Arizpe, Coahuila
- AdrianControls Engineer · Castaños, Coahuila
- JuanControls Engineer · Saltillo, Coahuila











