Levi — Automation Engineer
Levi
Pay Rates
Industries Served
Languages
Work Preferences
Work History on Automate America
Documents on File
Achievements
5
Profile

Tenure

Earnings

Hours

Skills
Programming Skills 8
2018 Fanuc Robotics North America Rochester Hills, MI Mechanical training on M2300iA/2300 2017 Leoni Training Nashville, TN Allen Bradley Rx Logic and Safety toubleshooting 2017 Leoni Training Nashville, TN Fanuc Electrical troubleshooting 2016 Leoni Training Nashville, TN Fanuc R2000, M900, Arc Mate Mechanical
ALSO: KV STUDIO PLC PROGRAMMING
Skilled Trades 3
Honda Technical skills challenge contestant in 2016, 2017, and 2018. 2018 Silver medal for Robotic cell troubleshooting. Attended breakout sessions of Fanuc ZDT and more.
Software Competencies 4
Professional Competencies 8
Over the llast year I've been involed in multiple OEM and small business manufacturing projects with both complete new cell control installs and upgrades.
Software strengths include: Omron - CX One - Sysmac Studio Mitsubishi - GX Works 2&3 Allen Bradley - RS500 through Studio 5000 Keyence - KV Studio Automation Direct - Productivity Suite - Click - Direct Soft Red Lion - Crimson
2018 Fanuc Robotics North America Rochester Hills, MI Mechanical training on M2300iA/2300 2017 Leoni Training Nashville, TN Fanuc Electrical troubleshooting 2016 Leoni Training Nashville, TN Fanuc R2000, M900, Arc Mate Mechanical Above are the technical courses I've been through.
Autocad or Solidworks design and modification
Applications 11
Experience in SICK marking systems and integrations.
Past electrical experience has involved VFD upgrades and new cell sizing installations.
Tools, Machines & Equipment 9
My Business
Customer Reviews1
Levi was a great help commissioning our 2 Omron and Mitsubishi PLC projects. Thank you.
Work Experience7

Fanuc and Yaskawa robotic teaching Complete cell electrical design and installation Customer downtime and equipment repairs

Contracted as a controls integrator for companies through AMG doing new model upgrades, new equipment and cell installation, and equipment downtime requiring external support. Mitsubishi Q and QS, Allen Bradley, Omron CX and NX PLC and Safety PLC's Fanuc and Yaskawa robotic integration

Mitsubishi, Allen Bradley, Omron, Productivity Suite, Keyence, Red Lion, PLC as well as Omron, Keyence, Allen Bradley, safety PLC integration and modifications. Sole responsibility of project management and implementation of process improvements from drawings to signoff. Cost analysis and value stream mapping for plant operations while utilizing Wave for accountability. Design and implementation of automation and machine building to streamline processes and improve ROI. Some of the latest projects include Packaging streamlining, UR robot cell integration, in process quality verification, single station laser, grease, and Zerk stations as well as cell process modifications improving OEE using previous years of 5s, Kaizen, and Kanban training.

Allen Bradley, Mitsubishi, and Omron PLC Schenk balancer and mainline systems modifications and updates Mitsubishi (J3 &J4) and Allen Bradley (Kinetix and Powerflex) servo drive upgrades and parameter modifications Mitsubishi and standalone Gemco and Sick encoders Modify and or replace VersaView and PanelView HMI's Modify delivery systems to accommodate multiple new model assemblies including logic and physical dimensional changes of conveyors and delivery systems of Joloda restraint delivery trailers.
Fanuc and Motoman robot and Nobot troubleshooting and repairs, Omron plc, Bosch and MEDAR weld timer troubleshooting, Yaskawa motion controls, VFD installation and reprogramming Maximo usage and tracking of equipment repair history and report tracking of departmental cost and equipment burdens Shift communication and downtime accountability Plan and schedule team to complete monthly PM's and repairs Present reports of PM completion and counter measures of downtime Train team members on equipment and troubleshooting processes Evaluate department downtime reports to plan and implement alternate methods or machine updates Complete zone improvement ideas and implement the plan, do, check, act procedure

Jacksonville, AL Operate facility's Automated Stacking and retrieval System (ASRS) Maintain operability of electrical and mechanical systems of the ASRS Coordinate with plant operations to achieve cooperate goals between departments Manage workload requests and maneuver employees to reach desired goals Use Microsoft Access, Excel and other specialized programs in order processing duties

Residential, commercial, and Industrial electrical services
Facilities Worked At5


Related professionals
- TAutomation Engineer · Trussville, AL
- ChristopherAutomation Engineer · Decatur, Alabama
- AlonsoAutomation Engineer · Huntsville, AL
- PatrickAutomation Engineer · Trafford, Alabama
- MichaelAutomation Engineer · Tennessee, spring hill
- MattAutomation Engineer · Mattawan, MI
- DigamberAutomation Engineer · Pune, Maharashtra
- MalikAutomation Engineer · Lahore, Punjab














