Santiago — Controls Engineer
Santiago
Industries Served
Service Radius & Travel
Work Preferences
Eligibility
Work History on Automate America
Programming Skills 3
For 13 years with my first project carried out in RSlogix 5, I have been working with all Rockwell families for a long time with standards for FCA Magna and GM mainly, I have been in projects as a leader or controller only in programming.
thorough knowledge of hardware, software, programming, automatic controls HMI interface for diferent project on also Programing V90 servo positioning index conveyor. I have carried out projects from AutoCAD design with systems in Smallfoot Print, servo positioning for more than 13 years, not only in Siemens but also in AB
I have been making designs for the production of CNC parts on a fadal machine that I own, for a welding project, I made my drawings in Inventor and the CNC programming in Fusion 360
Achievements
2
Tenure

Profile
About Me
I have been in the habit for years of always seeking to efficiently complete assigned projects in a timely manner.
Skilled Trades 1
GM standard PPE stations are validated on all new electric GM Launch Truck (C1UC, D2UC, R233,C233,L232)
Professional Competencies 1
Applications 2
I have been designing applications from scratch at AB/Siemens for over 10 years
Programming of V90 / Kinetics Servomotors in conveyor positioning and board feed elevators for the new GM SUVs
Why Choose Me
I have been in the habit for years of always seeking to efficiently complete assigned projects in a timely manner.
Work Experience8
Allen Bradley PLC and HMI Design and debug for GM launch, support lines Stacker P3/P4 Station all this according to (Standard GM- GCCS-2 / GM- GCCH-1)
Allen Bradley PLC and HMI Design and debug for GM launch of products C1UC, D2UC, R233,C233,L232, design and debug for all Trim, Door and Pretrim line, implement EPP and tooling logic for all model BEV, Config all station hardware and software for EPP Station / CDE create update program for PreTrim Line(Dic 2023). all this according to (Standard GM- GCCS-2 / GM- GCCH-1 /GM-EPP standard).

Design and Manufacture of mechanical parts on CNC Fadal and all Programming CAM subroutines with Fusion 360 Software Programming and design Electrical cabinet also HMI / PLC logic for all station I/O CompactLogix and Robot ABB IR1600 ID mapping for lockers Welding. set-up at the Comesa plant.

Siemens PLC / HMI Design and debug all Design electrical cabinet and installation supervision Design Mechanical Conveyor Index for Servo positioning. Programing and Debug 3 station Index Servo Positioning (V90 Siemens Control motion). Programing and Debug all station and System Vision (Cognex5100/7000/1050) for Diameter Interior/ Exterior and Perpendicularity for each spring. I/O Mapping YaskawaCP25 Robot.
PLC, HMI Modification, Debug and Programing Line 1 and 2 for new Control IT department and Line Station
Allen Bradley PLC and HMI Design and debug for GM launch of products T1XX, Cycle time improvements & production support. (Standard GM-SCC2) Allen Bradley PLC and HMI Modification and Hardware Safety/standard configuration all Conveyor debug for New Plant Paint Shop, (Standard GM-SCC2)
Software Logic Modification for new model and HMI screen add and upgrade
PLC and HMIs Modification for new model C1UC,Support AA and BA Mains Line, Followed Spec. (Standard GM-SCC2)
Education / Training / Certificates1

Facilities Worked At8

Related professionals
- DanielControls Engineer · Saltillo, coahuila
- MatheusControls Engineer · Saltillo, Coahuila
- JosueControls Engineer · Ramos Arizpe, coahuila
- ManuelControls Engineer · Saltillo, Coahuila
- DanielControls Engineer · Torreon, Coahuila
- FelipeControls Engineer · Ramos Arizpe, Coahuila
- MiguelControls Engineer · Saltillo, Coahuila
- EduardoControls Engineer · saltillo, coahuila