JRR — Sr. Controls Engineer
JRR
Industries Served
Work History on Automate America
Secure & Personal Files
Verified documents on file. Only JRR and Automate America admins can view or download them — except the background check, which is shared with a customer when they shortlist JRR.
- Resume✓ On file
Programming Skills (8)
About Me
- English 70%. - Robot Programing ABB IRC5 - Robot Programing Fanuc - Robot Programing Nachi - Robot applications: Material Handling, MIG welding, Spot-welding, hemming, glue application, palletizing. - RobotStudio - Roboguide - Studio5000 - RSLogix5000 - IRVision 2D - Factory Talk View - Autocad - Inventor - Solidworks - Automatic control (hydraulic, pneumatic, electric). - Mechanical design. - Develop of engineering. - Control of manufacturing cells. - Operating machinery. - Programming CNC
Skilled Trades (8)
Software Competencies (3)
Professional Competencies (4)
Applications (14)
Work Experience(19)
Period September 2016- April 2018 GM Projects to new 2019 models to some different plants in US (Lansing, Flint, FairFax,SpringHill ) and others in Mexico (Silao, Ramos Arizpe, SLP). Fanuc Robots
Period September 2012- September 2014. Grupo Gersa Monterrey S.A. de C.V. Tegucigalpa #107, Col. Zimex, Santa Catarina, Nuevo Leon. Position: Junior Engineer. Department: Engineering (projects and services). Immediate boss: Julien Darnaudguilhem. Position: Engineering manager. Activities: Projects development and service engineer in automation projects. Projects: - Minera Fresnillo PLC S.A. de C.V. Project of installing of sampling cells in the laboratory of Minera Noche Buena for gold and silver separation, programming PLC RsLogix to six cells of the process and startup of this Project. - General Motors Aluminum Foundry, Toluca, Mex. Support to production and maintenance, in programing of Fanuc Robots, IR-vision, Rslogix5000, HMI modification, in-sight vision and Siemens s7 Sinumerik. - Minera Fresnillo PLC S.A. de C.V. Project of installing of sampling cells in the laboratory of Minera Fresnillo for gold and silver separation, programming of ABB Robots for this process. - MartinRea S.A. de C.V. Maintenance to ABB Robots. - Acurride de Mexico S.A. de C.V., Monterrey, Mexico Re-programing a cell of washing trucks wheels and maintenance of Fanuc Robot and controller of this cell. - Varroc Lighthing Systems, Monterrey, Mexico. Support and programing of urethane application cell for the car lights, with ABB Robots. - General Motors, Silao, Mex. Change of principal and backup robots ABB to Fanuc of bodywork cell for the manipulation the floor and change de position with the pneumatic manipulator, programming the routines of robot and configuration of signals between PLC and Robot. - Chrysler, Saltillo, Mexico. Program Fanuc Robots for a new model of bodywork in a line of assembly trucks
Period November 2018 - June 2019. Sr. Controls Engineer in Honeywell Intelligrated International. Programing PLC Conveyor, Sorter and Robots in Distribution Centers (Amazon, Big Lots, etc)
Period April 2018. Tesla Motors, Reno Nevada. T3 Model Battery
Period July 2016- August 2016 MPS Project in Chrysler Toluca with Nachi Robots, modifications in Versarroll Undebody line, to the new project to improve the Cycle Time and some collisions, and support
Period October 2015- May 2016 Project D2UC GM Assembly Plant Ramos Arizpe, Mexico Start the Robot programming in Novi, MI in the Comau Installations with the starter of robots, wizards and initial setting, then programing the styles inside the GM Standard, and finally debug and try out to GM Buy off, then Installation in GM Assembly Plant in Ramos Arizpe, Mxico, re- checking the all programs of body side and framing robots, change and reprograming the end effectors of current production robots to update for the D2UC model and re-teaching the all programs with sheet metal y parts of production, debug and startup the all robots of body side and sheet metal, programing the tool changers of some robots and modification of programs to update options of tool changer application. Support and modifications in some cells of D2JC and D2LC project
Period July-August 2015 Project Muffler Assembly to Ford Trucks for Louisville, KY ford Assembly Plant, program the Fanuc Mig Weldig Robot with coordinated axes to assembly muffler to Ford Trucks in Easom Automation, MI
Period May 2015 Project Support GM Engine in Flex N Gate, Guanajuato Plant, new model of engine support to GM programming the ABB and Fanuc Robot for the new model welding path
Period April 2015 Project Fiat 500 China sport, Chrysler Toluca, some little modifications in the body shop line to add the China sport model in ABB and Nachi Robots
Period March 2015 Project GM Powertrain, Saginow MI, Aluminum Foundry Head Line 2015, re-teach the positions of Robots, and debug in the changes of PLC, and screen modifications
Period January-February 2015 Project Support to Start production Ford F-150 Frame in Robot and PLC, and reteach the welding robots to new models of productions. Metalsa E-town, KY. Period December 2014 Project Comau/GM to the new line of Sonic for the Plant GM Ramos Arizpe, programming the Fanuc Robots of zone HA-170-200 in the instalations of Comau Mxico, Debugg an Start up, Robot aplication SpotWleding
Period March 2012-September 2012. Manufacturas Automotrices MASA. Eje Central Lazaro Cardenas #1073, Col. Nueva Industrial Vallejo, Del. Gustavo A. Madero, Mexico D.F. Position: Assembly supervisor and Robots programming. Department: Production/Engineering. Immediate boss: Ing. Juventino Cesar Ayala. Position: Plant manager. Activities: Supervision of all assembly line and the MIG welding application in this line, robots programming (ABB and Fanuc) for the MIG welding application for assembly of automotive parts, fuel and air tanks to trucks. Design of fixtures to assembly and new prospect with fuel aluminum tanks using the TIG welding applied with the Fanuc robot
Period January 2011- March 2012. SMD Servicios de Manufactura y Diseo S.A. de C.V. 3. Calle sur no, 33 Col. Independencia, Tultitlan, Estado de Mexico. Position: Product engineer, Project manager. Department: Engineering/Projects. Immediate boss: Ing. David Jonhnston/ Ing. Manuel Morell. Position: Engineering manager / Sales manager. Activities: DesignandEngineeringofproduct,Supplierdevel - p m e n t, p l a n t supervision, installation supervision, project manager
Period February-November 2010 Centro de Investigacin y Estudios Avanzados del IPN. (CINVESTAV). Av. Instituto Politecnico Nacional 2508, Col. San Pedro Zacatenco C.P. 07360, Mexico D.F. Position: Investigation Assistant. Department: Projects. Immediate boss: Ing. Gustavo Garcia Lory. Position: Project manager. Activities: Selecting, quote and acquisition of electric, electronic material to acquisition of signals, design of control loops, translation and interpretation of technical articles about pumping plants, data acquisitions to monitoring
Education / Training / Certificates(3)
Frequently Asked Questions
- What does JRR do?
- JRR is a Sr. Controls Engineer on Automate America, the global professional marketplace for skilled talent across industrial, commercial, and residential work.
- Where is JRR located?
- JRR is based in Troy, Michigan.
- What does JRR specialize in?
- JRR works with ABB, Fanuc, Honeywell, Siemens, Comau as a Sr. Controls Engineer on Automate America, the global professional marketplace for skilled talent across industrial, commercial, and residential work.
- Is JRR available for work?
- Availability unknown. JRR has not marked it recently.
- How do I connect with or hire JRR?
- Create a free profile on Automate America and send a connection or contract request from this profile. JRR can then respond and coordinate the work directly through the platform.
















