Marius — Controls Engineer
Marius
Industries Served
Work History on Automate America
Documents on File
Achievements
2
Tenure

Profile
Programming Skills 2
Skilled Trades 5
Professional Competencies 9
Applications 12
Tools, Machines & Equipment 1
Eligibility
Work Experience19
Microsoft Office, AutoCAD, Ladder Logic, FIS (Factory Information System) 2019 PC
2016 -Design, build and commissioning of: -Powertrain assembly lines new and retooling
2015 -Machining line washers retooling and upgrades
2014 -Fluid fill stations for brake, coolant, power steering, AC

2013 2012 -Project management roles during all phases of the projects - Controls Engineer, Cinetic Dynamic Automation Group (DyAG), Farmington Hills, MI
2011 -Design, build and commissioning of: -Engine, transmission and axle assembly lines
2010 -Commercial AC compressor assembly line

2009 -Plastic friction welder stations -Project management roles during all phases of the projects

2008 2007 - Controls Engineer, Cyberlogic, Troy, Michigan
2006 -Design, build and commissioning of: -FIS systems for axle assembly lines

2005 2004 - Controls Engineer, Automatic Handling Inc., Erie, MI -Design, build and commissioning of: -Radial and axial wrappers for paper and plastic rolls
2003 2002 -Cardboard and cardboard core cutters

2001 - Controls Engineer and Process Designer, Takata Electronics, Farmington Hills, MI
Design, build and commissioning of: 2000 -Crash detection sensor assembly lines -Electronic circuit boards assembly lines

1999 1998 - Maintenance Shift Leader, Oakley Industries, Detroit, MI
1997 -Troubleshooting and maintenance of: -Wheel and tire assembly line

1996 - Electronic Technician, Eagle Equipment, Redford, MI
1995 1994 -Repair of laser and optical construction equipment, theodolites and levels 1993
Education / Training / Certificates2
1988 1987 Customers and Projects: Ford Motor Company: Plant - Livonia Transmission Assembly, Ohio Truck Assembly Plant, Dearborn Truck Plant. Projects - Update repair stations to current product models in Steeplechase controls, Brake fill for commercial trucks, AC refrigerant fill. Tesla Motors: Plant - Fremont Assembly (former Toyota NUMMI plant) Project - Build, install and commission of fluid fill equipment for the S Model. Brake fill, radiator coolant fill, windshield washer fill and air suspension fill. General Motors: Plants - Oshawa final assembly, Hamtramck final assembly, Flint powertrain assembly, Lordstown final assembly, Fairfax final assembly, Saltillo Mexico engine plant final assembly, Spring Hill powertrain assembly, Baltimore powertrain assembly Projects - Build, install and commission of fluid fill equipment for assembly lines. Brake APD (Air Pressure Decay)testing, brake fill, power steering fill, radiator coolant fill and air conditioning fill including R134a refrigerant changeover to YF1234 (HFO) refrigerant. Build, install and commission of engine and transmission assembly lines for many assembly plants. Chrysler: Plants - Dundee engine assembly, Kokomo transmission assembly, Saltillo powertrain assembly, Trenton powertrain assembly, Warren truck assembly Projects - Build, install and commission of the Saltillo assembly line for the Hemi 5.7L engine with emphasis on the B&K Manufacturing cold and hot test stands. Build, install and commissioning of the Cinetic Automation Dundee assembly line for the World Gas engine. Model upgrades to the Hirata Dundee Assembly line of the Fire engine. Upgrades to the Hirata Trenton assembly line to improve FIS (Factory Information System) reporting and bottle neck auto stations cycle time improvements. Honda: Plant - Alliston ON final assembly, East Liberty, OH final assembly, Lincoln, AL final assembly. Project - Design, install and commission of Bielomatik friction welding equipment for plastic dashboard components, fluid fill for AC refrigerant fill. Nissan: Plant - Cuernavaca final assembly Project - Design and install of fluid fill equipment for AC refrigerant fill. American Axle Manufacturing: Plants - Hamtramck machining and assembly, Three Rivers assembly, Buffalo machining and assembly Projects - Build, install and commission of the Cinetic Automation third member assembly line and development and integration of the FIS (Factory Information System) data collection system. Takata Automotive Safety Systems: Plants - Farmington Hills assembly Project - Design, install and commission of automated assembly line for crash detection sensors
1990 - ITT Technical Institute, Troy, MI and Indianapolis, IN -Bachelor of applied science in the field of electronics engineering technology
Related professionals
- AldoControls Engineer · Troy, Michigan
- ChristopherControls Engineer · Mount Clemens, MI
- DillonControls Engineer · Grand Blanc, Michigan
- IrwinControls Engineer · Sterling Heights, Michigan
- ChristopherControls Engineer · Grand Rapids, Michigan
- ZaidControls Engineer · Sterling Heights, Michigan
- JohnControls Engineer · Grand Rapids, Michigan
- JeffreyControls Engineer · Suttons Bay, MI






