Clarence — Maintenance Lead
Clarence
Industries Served
Eligibility
Work History on Automate America
Documents on File
Programming Skills 6
Achievements
3
Tenure

Profile

Skills
About Me
Skilled Trades 5
Software Competencies 1
Professional Competencies 7
Applications 11
Tools, Machines & Equipment 16
Work Experience12

Maintenance Lead / Field Service(July 2014 to present) Ken McCorkle G.E. Oil and Gas New Braunfels, TX.78132 Work at different job site installing, repairing and commissioning L & G Modules (Liquid and Gas) for GE throughout the US and overseas. The some of the equipment I have work on includes rebuilding Schulmberger J pumps and Mycom pumps putting in seal kits. Repair motors such as Baldors, Siemens and Goulds motors. Corken compressor, Roth Pumps, Sundyne Compressors, Flow Serve Pumps, Amine Booster Pumps plus many more I have worked. I have my universal HVAC refrigeration license. Providing quality control inspections and certifications. Run and maintenance department handing out work orders and PM's to the maintenance team. Order parts from our vendors. Setup and coordinate with contractors working in our plant. Close out work orders in NetFacilities and Gensuite insuring they are on time and completed with G.E. standard. Maintained facility equipment including cranes

Maintenance Manager (May 2012 to 2014) Plant Manager Travis Lechmer Polymer Logistic, TX. Run the maintenance department and the facility. Making sure both facility and the equipment have no breakdown issue. When a break down occur make sure equipment are back up within a timely manner. Order material at a reasonable price where the company saves money. Find way cost saving on equipment

Machine Maintenance Engineer Team Leader (August 2006 to February 2012) Supervisor Yasuhiso Iwase Takumi Stamping, Texas Inc. 1 Lone Star Pass, Bldg. 40 San Antonio, TX. Schedule and hand out assignments out to co-workers. Diagnose, troubleshoot, repair, overhaul and rebuild all types of mechanical and hydraulic machines tools. Maintain the facility equipment including cranes, pumps and pneumatics. Respond to work orders and trouble-shooting in a repair and maintenance work environment

Maintenance Technician (December 2003 to August 2006) Supervisor Santy Tim H.E.B. Bakery North Pan Am Expressway San Antonio, TX. Perform preventing maintenance on equipment. Install all type of motors such as, AC / DC motors, single phase motors and three phase motors. Install and assembly conveyors drives, worked on ovens, mixers, pumps, pneumatic system, PLC, and inverters

Night Shift Lead Man (March 2002 to December 2003) Supervisor Jensen James Lancer Corporation San Antonio, TX. Setup programs on spot welders. Hand out assignments to co-workers. Run a robotic welder, adjusting the setting for operations. Do prevented maintenance on spot welders and the robotic

Welder (October 2001 to March 2002) Supervisor Bell Corkland Car Tech Motor Spring Branch, TX. Fabricate parts according to blueprints. Build exhaust system and turbo kits for Ford Mustang, Mazda, and Toyota. Weld on different types of materials such as steel, stainless, and aluminum

Electrical & Mechanical Technician (July 2000 to 2001) Supervisor Vaughan Reggie Tokyo Electron Texas Austin, TX. Assembled and modified the "clean track's act 8 coater and developer", ensuring the act 8 met the customer's specification. Completed all required inspection, rework, and documentation, allowing the act 8 to have a smooth transition from lower assemble department to final test department. Coordinated scheduling between supervisor and the assemble teams. Maintenance Engineer Technician Flowers Bakery (Supervisor Steve or Rick) P.O. Box 18303 San Antonio, Texas May 1999 to July 2000 Worked in a 250,000 square foot bakery, maintaining machinery to keep the plant running. I Performed emergency troubleshooting repaired and performed preventive maintenance on three phase motors and conveyor systems. Adjusted and performed troubleshooting of sensors and pneumatic systems. Worked video jets making sure they did not get clogged up through the ink lines. Installed PLC's, did preventive maintenance on high and low voltage cables and transformers. Monitored plant HVAC system and other environmental controls
Education / Training / Certificates6



















