Juan — Robot Programmer
Juan
Industries Served
Languages
Work History on Automate America
Documents on File
Programming Skills 3
FANUC robot programming using SPOT/Mig welding and material handling applications
Cycle time improvement (Framing, UB & BodySides). Management applications: Spot Welding, Seal, Material Handling, Stud Welding, Arc Welding. Programming routines for UB Electric F500. Commissioning.
Integra certified- Robot Programming Kuka robots for Mercedes Benz following their standards.
Achievements
2
Tenure

Profile
About Me
Electronics Engineer Specializing in Automation.
Skilled Trades 2
Weld guns commisioning and peripherals configuration for various robot models.
Cycle time optimization Wheel House line and Cycle time improvement in rail LH&RH line
Software Competencies 6



Professional Competencies 2
Over 5 plus years programming robots in both the US and Mexico with some of the most popular robot manufacturing types.
Vision System Troubleshooting as well as Cycle time improvement (Framing, UB & BodySides) experience.
Applications 6
KUKA Robots commissioning as well as check and re-program OLP´s (Spot and material Handling)
Programming routines for MIG and Material Handling in rear Cradle Project (GM).
Cycle time optimization and Programming inspection routines and logic for crankshafts line
FANUC RJ3 robot programming using SPOT welding and material handling applications.
Perceptron Vision System Troubleshooting.
Tools, Machines & Equipment 1
Service Radius & Travel
Work Preferences
Eligibility
Work Experience1

MERCEDEZ BENZ ALABAMA -KUKA Robots commissioning. Profnet devices configuration. Check and re-program OLP´s (Spot and material Handling) GM, SILAO -FANUC RJ3 robot programming using SPOT welding and material handling applications. BMW SOUTH CAROLINA -ABB and KUKA robot programming - Cycle time improvement (Framing, UB & BodySides) VOLKSWAGEN, PUEBLA -FANUC R2000iA Robots and RJ3-ic Controller. -Tiguan Finish line production support. -Perceptron Vision System Troubleshooting. OPEL, ZARAGOZA - SPAIN -FANUC R2000iA Robots and RJ3 Controller. -Optimization of Line -PICASOO and MOKKA new models programming AUTOTEK, PUEBLA -FANUC ArcMate 120iC, R2000iC Robots and RJ30iB controller. -Programming activities, management and safety configuration DCS. -Status reviewing offline programs. -Commisioning of FANUC robots -Programming and optimization of the Rear Cradle MP Project line. CHRYSLER, TOLUCA -ABB IRC5 Robots programming -ABB robot programming -UB Electric F500 programming routines. MODATEK SYSTEMS, ONTARIO -FANUC ArcMate 120iC, R2000iB Robots and RJ-30iB Controller -Commisioning of the main line robots. -Programming routines for MIG and Material Handling in rear Cradle Project (GM). -Miller Arc Weld equipment configuration and safety (DCS). MAGNA, SLP -Cycle time optimization Wheel House line -Cycle time improvement in rail LH&RH line. -Production line support. FORD, CHIHUAHUA -FANUC M16 Robot and RJ3iB Controller. Mechanic Arm Calibration. Creating New TCP and UFRAME. Programming inspection routines and logic for crankshafts line (engines 2.0 & 2.5. CHRYSLER SALTILLO -FANUC R2000iB 260F, M900 260L, M900 350L, M900 600L Robots and RJ-30iA programming. Weld guns commisioning and peripherals configuration. DCS Configuration Cycle time optimization Production Support
Related professionals
- AlejandroRobot Programmer · Villa de Cos, Zacatecas
- VÍCTORRobot Programmer · Villa de Cos, Zacatecas
- AaronRobot Programmer · North Baltimore, Ohio
- WAGNERRobot Programmer · Rochester Hills, MI
- DELL’ANNUNZIATARobot Programmer · Naples, Campania
- J.Robot Programmer · Valencia, Valencian Community
- S.Robot Programmer · Valencia, Valencian Community
- DanielRobot Programmer · San Jose, California





