Larry — Packaging Maintenance Supervisor
Larry
Industries Served
Work History on Automate America
Documents on File
Achievements
3
Tenure

Profile

Skills
Programming Skills 6
Skilled Trades 1
Software Competencies 1
Professional Competencies 12
Applications 14
Tools, Machines & Equipment 1
Eligibility
Work Experience6
1000 series. I remain involved in the day to day operation of Oven and Burner Management system. I am getting more involved in the communication end using RTU / Mobus/Ethernet IP /Remote I/O. Continuing to sharpen my skills with Allen Bradley Servo Drives. Currently I am now more involved using Indramat and Sew servo drives plus Parker Hydraulics servo. As always trying to keep up with the current improvements and new PLC coming out on the market. I have found a new interest working with Automation Direct and their other family of products that work so well together such as their GS2 drives (VFD's) and ViewMarq Led Message displays they have made it so easy to induce the communication between the PLC and Drives and displays. They really have made these a pleasure to work with. Some of the software still has some quirks but finding it easy to work around

12/18/2002 Implementation of factory wide automation providing 24/7 support in system operations and troubleshooting and repairs. Both In Process and Packaging Facility Providing PLC and HMI code for new installation and modifications to exiting equipment including design of electrical and hardware layout. Programming and Installations of VFD's.Support for PLC/ computer networks and servers. Involved in companywide efforts to evaluate and identify all critical areas of Process / production loss and provide corrections and solutions. Accustomed to performing in deadline-driven environments. Computer / Fiber Networking Specialist: PLC and Automation Hardware Specialist: Process and Packaging HMI/PLC programmer and support AutoCAD/Smart Draw Providing Electrical prints and complete documentation on final projects Electrical design / support

September 2014 to October 06-2017 (3 years 1Month) Supervising a crew of Instrumentation and Electrical technicians in the daily functions at Riviana Foods facility covering over 26 acres. Organizing Electrical Contractors in the daily Electrical Facility projects. Implementation of Factory wide Automation providing 24/7 support in system operations and troubleshooting, repairs. Involved in the daily diagnostic and repair. Providing constantly changing PLC and HMI Programming updates for new installation and modifications to older Facility equipment. Design of Electrical, Hardware layout Installations. Providing 24/7 hour coverage and electrical guidance, support for facility electrical hardware. Involved in the daily diagnostic and repair of Riviana manufacturing automated equipment. Working in facility that spans over a 26 acres built in the mid-1980s has provided me ample opportunities and challenges to sharpen my NEC, NFPA-70 E and OSHA skills and provide improvements to this facility to ensure the safety for ARI/Riviana employees.In charge of capital Projects such as lighting upgrades to LED fixtures in multiple buildings and outdoor lighting upgrades for security. Purchasing and installing multiple 12.47KV to 480 Volt Secondary 3000 KVA Step down transformers responsible for Facility 12.47KV Medium Voltage Switch gear maintenance and repairs. Electrical Capital Projects I have had in my charge include purchasing and coordinating installation of New Electrical Switch gear / LED Lighting upgrades and layout for multiple buildings. Coordinating the rebuild's of 3000 KVA Step down transformers and multiple Facility shutdowns for installation, repairs of transformers and switch-gear. Research and Development at a Facility that is older than 30 years involves planning and implementing OSHA required LOTO devices ensuring safety of all. Research and development of Facility Emergency and Egress Lighting. Planning,design and layout supervising implementation to bring a facility 30 years old into OHSA, NFPA 70E and NEC Code Compliance. Creating necessary Budgetary CER for projects and providing supervision of ongoing electrical projects at Facility wide level and promoting Safety. My last duties I was put In charge of new Automated Packaging facility providing Electrical Layout including Design and installation of Lighting, Electrical drops,installation of multiple 3000 KVA transformers,restoring power from medium Volt switchgear, supervising of installation of MMC and switchgear plus interlocking of older equipment to new automated lines plus adding to my responsibilities taking on the role as Packaging Maintenance Supervisor. Automation PLC Technician/Multi Craft Tech. Greif Brothers HS2 Plant

up running at end of June 2010 I was offered the position of the Electrical / Automation Supervisor in Memphis and the chance to relocate there however I declined the offer. While I was employed at Riviana Foods I provided every day support of Computer / Fiber. Networking PC/PLC network and servers working as a PLC and Automation Hardware Specialist in the Process Dept. and also in the Packaging Dept. as a HMI / PLC Programmer/Specialist providing 24x7 around the clock support also working with AutoCAD 2010 and Smart Draw software Providing Electrical prints and complete documentation on final projects and Electrical design layout. I also enjoyed daily work with Boilers and Burner Management systems and daily improvements to the electrical and process controls Plaze, Inc Packaging and Containers St. Clair, MO ( ) Clair Missouri Title: Plant Engineer Employed 12 /2002 left 06/2004) Employed Twice Leaving both times to join Riviana Foods Recruited to design and implement factory wide automation providing upgrades to existing Packaging machinery Design of Explosive Gas level monitoring and alarming systems to ensure a safe LEL working environment and also to comply with EPA and local Fire protection requirements to keep the amount of Voc's leaving the facility @ EPA approved levels. Design and construction and automation of palletizing equipment & slip sheet, pallet delivery systems. Planned and implemented machinery alterations to ensure safety and improve operator ergonomics plus increase machine productivity and decrease downtime losses. Total Years of service2.5 years RIVIANA FOODS 2777 Allen Parkway Houston Texas ( ) Title: Project Specialist Employed Date's (10/1/2001 left
77019 June 2004-July 2011 Total 8.5 years Riviana Foods for around 8.5 years left after I remained to close the facility after completing installation of main Packaging line that was transferred from Houston location to the new Memphis facility this took around 5 weeks to complete and get
Education / Training / Certificates1
August 2011-September 2014 3yrs 2 months ( ) La Porte Tx. 77571 Upgrading and improvements to the existing Allen Bradley Control Loqix 5000 and SLC 500 Family processors plus upgrading the many Automation Direct Pac family PLC in house working also with Siemens Step 7 installing and upgrading C-More HMI Panels,remote and stand alone also still working with Allen Bradley's' Panel View
Related professionals
- BRobot Programmer/ Weld Engineer · KCMO, Missouri
- RichardSenior Controls Engineer · Camdenton, MO
- ArturoProject Engineer · Wright City, MO
- DavidMechanical Design Engineer and Project Manager · Dittmer, Missouri
- AQuality Assurance Technician · Grandview, Missouri
- CElectronics Technician · Grandview, Missouri
- JOSEPHWelder/Pipefitter · Butler, Missouri
- SamvelTechnician · KCMO, Missouri











