Controls Engineer

CLOSED

Job Description

Controls Engineer with Siemens PLC experience for installation commissioning and start up support at our customer sight in WI. The project is Material Handling from a Load Cell with a Robot. Loading to Handover Stand that will present the Material to be Loaded and Unloaded from CNC Machines.

Per Diem$68.00
Travel Day Per Diem$51.00
Hotel$130.00
Rental Car$60.00
Airfare$750.00
Travel Time$44.00/hr

Requirements that applicants must meet to be eligible

Yes = Able to Apply, No = Not Able to Apply

US work authorizationRequired

Eligibility Questions answered when you apply

  1. 1Are you a US citizen currently in the US ?Yes
  2. 2Do you have 3 years experience with programming Siemens PLCs / HMI's ?Yes
  3. 3Are you available to take on this project starting 3.3.2025 until at least May 2025 ?Yes
  4. 4Are you able to travel to WI for this project ?Yes
  5. 5To your knowledge are you able to work on DOD (department of Defense) contracts ? Yes
TIA PortalRequiredTIA v18 Update 5
Basic Electrical ToolsLockout Tagout KitLaptop

Certificate of Insurance (COI): A current COI must be uploaded to your profile before starting any project. This is essential for compliance with our insurance policy and to protect all parties involved. The minimum coverage required is $1,000,000 in General Liability. Please obtain your COI through the following process if you don’t have a current COI already:

    • Visit Hiscox Insurance.
    • Enter your Zip Code to specify your state.
    • Select/Type the nature of your work, for example, "Controls Systems Integration/Automation."
    • Indicate the structure of your business (Corporation, LLC, etc.). You can select ‘Other’ if you don’t yet have a company started.
    • Choose the date for your coverage to start.
    • Ensure you select a minimum of $1,000,000 General Liability Coverage.
    • Complete the Business Basics fields and follow the prompts to receive your quote.
    • Remember, quotes from Hiscox are valid for 30 days, and they offer assistance via chat and phone round the clock.

Timesheets and Expense Reports: These must be submitted by 9 AM on Monday mornings. Adherence to this deadline is crucial for maintaining our commitment to clients and for the timely processing of invoices. Please note the following late fee policy:

    • A late submission beyond the deadline will incur a fee.
    • Starting from Tuesday, a $100 late fee will be applied.
    • An additional $50 fee will be charged for each day beyond the initial late period.

Timesheets must be signed by the customer representative before submission.

Expense reports must be signed by the customer representative and include receipts.