Need experienced ABB / IRC5 programmer to help with cycle time reduction on exisiting cell with new kit install. Remove as much time from robots as possible to try and meet cycle time requirements.
Per Diem$150.00
Mileage$0.66
Eligibility Questions answered when you apply
1Are you authorized to work in the US?Required
IRC 5Required
SPRGood-to-have
Basic Hand ToolsBasic Electrical ToolsLockout Tagout Kit
Flat daily per diem for all days in Walker MI (working or not)
Milage of $0.655 per mile for initial to and from site.
Timesheets must be signed by the customer representative before submission.
Expense reports must be signed by the customer representative and include receipts.