#09204132
Controls Engineer
Automotive assembly systems
Woodhaven, MI, United States
Siemens, Fanuc, Keyence
Community Project
Looking for an experienced CE that knows Siemens (TIA Portal), Fanuc Robots, and maybe some Keyence VS knowledge as well to help finish up some final commissioning the next 2-3 weeks and then roll into production start up support for another 6-8 week with possible extension as needed.
Ford experience is definitely a plus.
Programming / Technical Skills
Siemens(Mandatory)
TIA Portal, WINCC
Tia Portal Software Version 17 or 20 or both as well as HMI layout.
Fanuc(Mandatory)
Handling Tool, R-30iB
Keyence(Good to have)
VS series vision systems
Software Licenses (Mandatory / Good to Have)
- Mandatory
- Good to have
Procedures And Policies
-
Certificate of Insurance (COI): A current COI must be uploaded to your profile before starting any project. This is essential for compliance with our insurance policy and to protect all parties involved. The minimum coverage required is $1,000,000 in General Liability. If you do not have or wish to obtain the necessary insurance, a deduction of 5% will be included from your billable time each week. Please obtain your COI through the following process if you don't have a current COI already:
- Visit Hiscox Insurance.
- Enter your Zip Code to specify your state.
- Select/Type the nature of your work, for example, "Controls Systems Integration/Automation."
- Indicate the structure of your business (Corporation, LLC, etc.). You can select 'Other' if you don't yet have a company started.
- Choose the date for your coverage to start.
- Ensure you select a minimum of $1,000,000 General Liability Coverage.
- Complete the Business Basics fields and follow the prompts to receive your quote.
- Remember, quotes from Hiscox are valid for 30 days, and they offer assistance via chat and phone round the clock.
Timesheets and Expense Reports: These must be submitted by 9 AM on Monday mornings. Adherence to this deadline is crucial for maintaining our commitment to clients and for the timely processing of invoices. Please note the following late fee policy:
- A late submission beyond the deadline will incur a fee.
- Starting from Tuesday, a $100 late fee will be applied.
- An additional $50 fee will be charged for each day beyond the initial late period.
Tools, Machines And Equipment Competencies
- Mandatory
- Good to Have
Safety Equipment Required
- 1.Standard PPE (Safety shoes, glasses, ear protection)
- 2.Lock out / Tag out
- 3.Safety vest
Key Information
- Start date 09/23/2026
- Estimated end date11/30/2026
- # People needed 1
- Shift Days
- Planned hours per day10
- Planned days per week 5
Bill Rates
- Base Rate (per hour) $ 68.00
- OT Rate (per hour) $ 88.40
- DT Rate (per hour) $ 108.80
- Travel Time Rate $ 52.00
Expenses
- Expenses are not reimbursed
Work Public Documents
There are no work public documents added.