PLC Programmer

CLOSED

Job Description

We are in need of a PLC Programmer for a project going to a customer in Newton, NC. It would be a retool addition to an existing axle assembly line. Needs to be able to work in Siemens S7 5.5 and WinCC2008. After that possible additional machines back at our facility in Macomb MI.
Per Diem$50.00
Rental Car$50.00
Mileage$0.58
AirfareCustomer books
Travel Time$49.50/hr
S7 5.5, WinCC 2008Good-to-have
KRC2, ED05 controllerGood-to-have
Siemens S7WinCC

Certificate of Insurance (COI): A current COI must be uploaded to your profile before starting any project. This is essential for compliance with our insurance policy and to protect all parties involved. The minimum coverage required is $1,000,000 in General Liability. If you do not have or wish to obtain the necessary insurance, a deduction of 5% will be included from your billable time each week. Please obtain your COI through the following process if you don't have a current COI already:

  • Visit Hiscox Insurance.
  • Enter your Zip Code to specify your state.
  • Select/Type the nature of your work, for example, "Controls Systems Integration/Automation."
  • Indicate the structure of your business (Corporation, LLC, etc.). You can select 'Other' if you don't yet have a company started.
  • Choose the date for your coverage to start.
  • Ensure you select a minimum of $1,000,000 General Liability Coverage.
  • Complete the Business Basics fields and follow the prompts to receive your quote.
  • Remember, quotes from Hiscox are valid for 30 days, and they offer assistance via chat and phone round the clock.

Timesheets and Expense Reports: These must be submitted by 9 AM on Monday mornings. Adherence to this deadline is crucial for maintaining our commitment to clients and for the timely processing of invoices. Please note the following late fee policy:

  • A late submission beyond the deadline will incur a fee.
  • Starting from Tuesday, a $100 late fee will be applied.
  • An additional $50 fee will be charged for each day beyond the initial late period.