Thousands of verified SCADA/HMI Developer professionals across North America — onsite, hybrid, or remote. Marketplace and automation service company. Direct contracting.
Reviewed by Automate America Editorial Team — updated 2026-05-26 — citing U.S. Bureau of Labor Statistics + O*NET SOC 17-3023.00.
SCADA/HMI Developer professionals on AutomateAmerica
$80-$143/hr
Suggested posting rate iSuggested rate is BLS-derived. Actual posting rate varies by location, duration, scope of work, and whether overtime is included. Post higher to attract applicants faster.
+7%
U.S. Bureau of Labor Statistics job growth outlook through 2034
What does a SCADA/HMI Developer do?
A SCADA/HMI Developer builds the touchscreens and supervisory dashboards that operators use to run a plant. They wire the screens to the PLCs, design the alarms, build the trends, and make sure the night-shift operator can tell at a glance whether the line is happy. You'd find them at water plants, power stations, food and beverage, and any factory bigger than a single line — the developers behind every screen on the floor.
SCADA/HMI Developers build operator interfaces and supervisory systems in Inductive Automation Ignition, Rockwell FactoryTalk View, Siemens WinCC, and AVEVA Wonderware. They model tags, design ISA-101-compliant high-performance HMI screens, configure historians, build SQL-driven dashboards, and integrate ERP/MES via OPC UA, MQTT, and REST.
U.S. Bureau of Labor Statistics outlook: +7% employment growth projected through 2034 (median annual wage $88,940). See the U.S. Bureau of Labor Statistics.
Unlimited-tag licensing (Ignition), MQTT Sparkplug B, Unified Namespace architectures, and HTML5/web-based HMIs are reshaping the discipline through 2034. Demand for developers bridging OT historians with cloud analytics is outpacing supply.
Onboard & manage. Use built-in time sheets, expense reports, and approvals.
Frequently Asked Questions
How do I hire SCADA/HMI Developer contractors on Automate America?
Post your contract on the Post Your Opportunity page. Verified SCADA/HMI Developer contractors will respond with availability and rates within hours. You select the best match and contract directly — marketplace and automation service company.
What does a SCADA/HMI Developer contractor cost per hour?
Hourly rates on Automate America are set by the SCADA/HMI Developer contractor based on experience, geography, and project scope. The platform stat block above shows the live average from recent contracts. For reference, the U.S. Bureau of Labor Statistics reports a national median annual wage near $88,940 for this occupation (see the U.S. Bureau of Labor Statistics for the most recent year). Specialized work commands 25-50% premium over the median.
Are SCADA/HMI Developer contractors available for onsite, hybrid, or remote work?
Yes. Automate America connects SCADA/HMI Developer contractors for onsite (any U.S. or Canada location), hybrid, and fully remote work. Specify your preference when you post the contract. You can also browse verified professionals by location before posting.
How fast can I find a SCADA/HMI Developer contractor?
Two paths — both fast. (1)Post your contract and qualified SCADA/HMI Developer contractors will apply within hours. (2) Skip the wait entirely — Search and Request Professionals directly from the SCADA/HMI Developer directory and message the people whose profiles match your need. Most urgent contracts ship within 48 hours.
Does Automate America vet SCADA/HMI Developer contractors before they apply?
All SCADA/HMI Developer contractors on Automate America have verified profiles, documented work history, validated skill sets, and reviews from prior customers. You can also request references, prior-work samples, and certification proof directly before signing.
Can I browse SCADA/HMI Developer contractors before posting a contract?
Yes. Search and Request Professionals shows the full SCADA/HMI Developer directory. You can filter by location, skills, and availability and message contractors directly — no contract post required.
What types of SCADA/HMI Developer contracts can I post?