Automate America has launched a new feature "Watchlist" that we think you will be excited about. Grow your network and get notifications about professionals and customers when they update their availability, skills and new work all from one window. Check it out from the "My Watchlist" tab on your dashboard today.
Holland, MI, United States
I'm an electrical controls engineer with 9 years experience in the automation industry. I specialize in Siemens PLC and HMI programming, machine startup for new equipment, improving existing production lines, production support and troubleshooting machine issues.
▪ Siemens STEP7 & TIA Portal PLC Programming
▪ HMI Design TIA Portal WinCC
▪ Ethernet/IP/Profinet Communication
▪ AC Motor Control and Commissioning
▪ KUKA & FANUC robot teaching, troubleshooting
▪ Experienced in 480/120 VAC and 24VDC Machines
▪ Cognex/Keyence Barcode & Vision System Programming
▪ Bosch Rexroth Tightening Systems & Kistler Presses
https://www.linkedin.com/in/scott-haver/
Scott is a great young Controls Engineer with a lot of talent already. He did an awesome job supporting new production run up for our customers MI plant. We will definitely use Scott again in the future.
Willing to work more than 60 miles from home city
6 months (Nov 2025 - May 2026)
Monitor and fix conveyor operations moving batteries throughout a large production facility. Conduct repairs and support uptime and continuous improvement projects.
2 months (Feb 2024 - Apr 2024)
Siemens PLC support and commissioning of a new production line. Startup, IO checks, troubleshooting, FAT and initial production runs.
1 Years 11 months (Mar 2022 - Jan 2024)
Provide PLC programming support and integration for new and existing equipment. Improve quality, performance and track production improvements. Commission new production lines and machinery. Perform site acceptance testing and approving new equipment. Support maintenance maintain uptime across 8 production lines.
6 months (Aug 2021 - Jan 2022)
Contract for Caster Consulting - Siemens PLC controls support for production ramp up of new poroducts. Working with Maintenance and Production to solve downtime issues and increase output.
6 months (Dec 2020 - Jun 2021)
Chandler, AZ - Contractor
Provided controls engineering support for the startup and production of 56 new N95 medical mask machines. ▪ Interacted with OEM JR Automation and Honeywell to integrate, troubleshoot, commission, and maintain new equipment. Worked with Allen Bradley PLCs, Fanuc Robots and custom-built machinery. ▪ Implemented autonomous mobile robots to transfer material to machines throughout the plant. Conducted site acceptance testing and standard operation documentation. ▪ Used Ignition software to collect machine data and create weekly production and performance reports
1 Years 9 months (Apr 2019 - Dec 2020)
Newton, NC
Design, build, test, troubleshoot, repair and modify system software to support production lines and develop more efficient assembly/testing processes. ▪ Developed machine electrical drawings, PLC/HMI program and controls documentation for a new seal press and verify station. Integrated new station components (Kistler press, Festo pneumatic servo controller, Cognex vision system, digital I/O sensors and pneumatic cylinder) into existing line. ▪ Integrated new KUKA robot gripper system that allowed production line to pick/place two new part types. ▪ Updated quality data TCP/IP communications between machines and plant server to store customer data.
3 Years 2 months (Jan 2016 - Mar 2019)
Grand Rapids, MI
Provided installation, programming, customer support, training, troubleshooting and upgrades for customer automotive equipment. ▪ Commissioned five end of line test loops for GKN Driveline to authenticate GM/Ford rear differential and power transfer units. Provided customer support, PLC programming and installed equipment. ▪ Start up of a wheel and tire line at CEVA Logistics in Mexico to automate the assembly of wheels and tires according to a customer build schedule. Tires are mounted to the wheels using robots, inflated, pressure verified using tire pressure monitoring systems, spun and balanced then verified using vision systems. ▪ Electrical engineer for six prop shaft balancing machines. Prepared bill of materials, ordered parts, updated machine drawings using AutoCAD and implemented PLC controls updates.
1 Years (May 2014 - May 2015)
Summer 2012, 2013, 2014, 2015
Battle Creek, MI
Assisted engineering groups to develop custom methods of quality testing and evaluation of products. ▪ Designed integrated circuits for HVAC testing to allow control of servo motor position and fan speeds. ▪ Programmed AVR microcontrollers for applications in PWM, ADC/DAC, Timers, UART and LCD/GLCDs.
There are no tools, machines and equipment competencies added.
Add the Facilities that you have worked at here.
There are no values and ethics added.
There are no community added.
Add my commitment and customers here.
No photos & videos added.
There are no documents added.