
#10153381
Robot Programmer
Water Jet Cutting
Kings Mountain, NC, United States
fanuc R-J3i arcmate 120iB M-16iB
Community Project
I need a capable programmer to transfer programs from a waterjet cutting cell containing 2 floor mounted R-J3i B robots to aother waterjet cutting cell containing 2 back wall mounted R-J3i B robots.
Both cells are currently working, we would just like to combined all product into one cell as the production requirements do not necessitate the need for both cells.
Programming / Technical Skills

Fanuc(Mandatory)
RJ3ib
The ability to transferprograms from one environment to another
Procedures And Policies
-
Certificate of Insurance (COI): A current COI must be uploaded to your profile before starting any project. This is essential for compliance with our insurance policy and to protect all parties involved. The minimum coverage required is $1,000,000 in General Liability. If you do not have or do not wish to obtain the necessary insurance at this time, a deduction of 5% will be included from your billable time each week. Please obtain your COI through the following process if you don’t have a current COI already:
-
- Visit Hiscox Insurance.
- Enter your Zip Code to specify your state.
- Select/Type the nature of your work, for example, "Controls Systems Integration/Automation."
- Indicate the structure of your business (Corporation, LLC, etc.). You can select ‘Other’ if you don’t yet have a company started.
- Choose the date for your coverage to start.
- Ensure you select a minimum of $1,000,000 General Liability Coverage.
- Complete the Business Basics fields and follow the prompts to receive your quote.
- Remember, quotes from Hiscox are valid for 30 days, and they offer assistance via chat and phone round the clock.
Timesheets and Expense Reports: These must be submitted by 9 AM on Monday mornings. Adherence to this deadline is crucial for maintaining our commitment to clients and for the timely processing of invoices. Please note the following late fee policy:
-
- A late submission beyond the deadline will incur a fee.
- Starting from Tuesday, a $100 late fee will be applied.
- An additional $50 fee will be charged for each day beyond the initial late period.
-
Safety Equipment Required
- 1.Standard PPE (Safety shoes, glasses, ear protection)
- 2.Lock out / Tag out
Key Information
- Start date 11/03/2025
- Estimated end date11/08/2025
- # People needed 1
- Shift Days
- Planned hours per day8
- Planned days per week 5
Bill Rates
- Base Rate (per hour) $ 87.50
- OT Rate (per hour) $ 112.00
- DT Rate (per hour) $ 122.50
Expenses
-
Daily Per Diem
$ 125.00
(Receipts Not Required)
- Mileage Reimbursement Rate Per Mile $ 1.000
- Rates may vary based on location
Work Public Documents
There are no work public documents added.