#02243276
Controls Engineer
Material Handling & Assembly Robots
Fort Loramie, OH, United States
Mitsubishi
Community Project
We are in need of 2 Controls Engineers experieinced with programming Mitsubishi PLC's / HMI's from scratch. We have 4 machines total, 2 are material handling / assembly / inspection, 1 is a WHIP cell, and the last is a outup cell. Fanuc robots are used along with Mirtsubishi VDF's / Servo's, and bar code scanners. Templates for sample code for PLC's and HMI's.is available. 2 of the systems will be build and commissioned on our floor, 2 will be built on the customer floor.
Start up support at customer plant will be required as well.
Starting week of March 3rd, for approximately 2 months.
Programming / Technical Skills

Mitsubishi(Mandatory)
GOT1000 and GOT2000 Series HMIs, GX Works3, MELSEC iQ-F
Procedures And Policies
-
Travel related expenses for those living outside the standard 50 mile radius of the plant.
Certificate of Insurance (COI): A current COI must be uploaded to your profile before starting any project. This is essential for compliance with our insurance policy and to protect all parties involved. The minimum coverage required is $1,000,000 in General Liability. Please obtain your COI through the following process if you don’t have a current COI already:
-
- Visit Hiscox Insurance.
- Enter your Zip Code to specify your state.
- Select/Type the nature of your work, for example, "Controls Systems Integration/Automation."
- Indicate the structure of your business (Corporation, LLC, etc.). You can select ‘Other’ if you don’t yet have a company started.
- Choose the date for your coverage to start.
- Ensure you select a minimum of $1,000,000 General Liability Coverage.
- Complete the Business Basics fields and follow the prompts to receive your quote.
- Remember, quotes from Hiscox are valid for 30 days, and they offer assistance via chat and phone round the clock.
Timesheets and Expense Reports: These must be submitted by 9 AM on Monday mornings. Adherence to this deadline is crucial for maintaining our commitment to clients and for the timely processing of invoices. Please note the following late fee policy:
-
- A late submission beyond the deadline will incur a fee.
- Starting from Tuesday, a $100 late fee will be applied.
- An additional $50 fee will be charged for each day beyond the initial late period.
-
Tools, Machines And Equipment Competencies
- Mandatory
- Good to Have
Safety Equipment Required
- 1.Standard PPE (Safety shoes, glasses, ear protection)
- 2.Lock out / Tag out
Key Information
- Start date Immediate
- Estimated end date08/03/2025
- # People needed 2
- Shift Days
- Planned hours per day10
- Planned days per week 5
Bill Rates
- Base Rate (per hour) $ 80.00
- OT Rate (per hour) $ 104.00
- DT Rate (per hour) $ 128.00
- Travel Time Rate $ 44.00
- Travel Trips Allowed (per month)2
- Travel Hours Per Round Trip 10
Expenses
-
Daily Per Diem
$ 68.00
(Receipts Not Required)
-
Travel Day Per Diem
$ 51.00
(Receipts Not Required)
-
Hotel Allowance Per Day
$ 130.00
(Receipts Required)
-
Rental Car Allowance
$ 60.00
(Receipts Required)
- Fuel $ 60.00
-
Airfare Allowance
$ 750.00
(Receipts Required)
- Mileage Reimbursement Rate Per Mile $ 0.700
Work Public Documents
There are no work public documents added.